API 5L/A53 GR.B, ERW Steel Pipe | ||||||
Outside Diameter | Wall Thickness | Length | Quantity 数量 | Remark | EXW CHINA | |
外径 (mm) | 壁厚 (mm) | 长度 (mtr) | PCS 根数 | TON 吨位 | Surface,End | USD/TON |
457 | 11.75 | 12 | 87 | 134.69 | PE. BLACK | $723.61 |
299 | 12.70 | 12 | 76 | 81.77 | PE. BLACK | $716.67 |
323.9 | 12.70 | 12 | 98 | 114.62 | PE. BLACK | $695.83 |
355.6 | 12.70 | 12 | 115 | 148.20 | BE. BLACK | $709.72 |
406 | 12.70 | 12 | 48 | 70.95 | BE. BLACK | $716.67 |
457 | 12.70 | 12 | 35 | 58.44 | BE. BLACK | $723.61 |
559 | 12.70 | 12 | 66 | 135.50 | BE. BLACK | $723.61 |
530 | 12.70 | 12 | 78 | 151.64 | BE. BLACK | $751.39 |
610 | 12.70 | 12 | 86 | 193.05 | BE. BLACK | $751.39 |
168.3 | 5.00 | 6 | 35 | 4.23 | BE. BLACK | $668.06 |
141.3 | 5.3 | 6 | 75 | 8.00 | BE. BLACK | $668.06 |
114.3 | 6 | 6 | 114 | 10.96 | BE. BLACK | $668.06 |
273 | 6.5 | 6 | 132 | 33.83 | BE. BLACK | $668.06 |
219 | 6.8 | 6 | 98 | 20.77 | BE. BLACK | $668.06 |
219 | 8.00 | 6 | 88 | 21.98 | BE. BLACK | $709.72 |
33.4 | 2.50 | 6 | 63 | 0.72 | BE. BLACK | $681.94 |
42.3 | 2.50 | 6 | 152 | 2.24 | BE. BLACK | $675.00 |
48.3 | 2.75 | 6 | 243 | 4.50 | BE. BLACK | $654.17 |
60.3 | 3.00 | 6 | 165 | 4.20 | BE. BLACK | $661.11 |
73 | 3.25 | 12 | 89 | 5.97 | BE. BLACK | $681.94 |
76 | 3.5 | 12 | 69 | 5.18 | BE. BLACK | $661.11 |
89 | 4 | 12 | 89 | 8.95 | BE. BLACK | $654.17 |
114.3 | 4.75 | 12 | 78 | 12.01 | BE. BLACK | $654.17 |
127 | 5 | 6 | 56 | 5.05 | BE. BLACK | $668.06 |
168.3 | 5.75 | 6 | 74 | 10.23 | BE. BLACK | $668.06 |
168.3 | 6.0 | 12 | 33 | 9.51 | BE. BLACK | $668.06 |
168.3 | 7.8 | 12 | 65 | 23.93 | BE. BLACK | $681.94 |
178 | 8.0 | 6 | 87 | 17.51 | BE. BLACK | $675.00 |
194 | 8.0 | 6 | 88 | 19.37 | BE. BLACK | $695.83 |
219.1 | 9.8 | 12 | 109 | 65.84 | BE. BLACK | $723.61 |
Note: | ||||||
1. The above price is based on BARE PIPE, for extra coating, please contact sales@primesteeltube.com; | ||||||
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com; | ||||||
3. The above price is NOT including any packing and end processing charge; | ||||||
4. The above price is only valide during June 21 - June 28; | ||||||
5. The applicapable MOQ for this price list is over 25 tons; |
HUNAN PRIME STEEL PIPE is the export gateway of SHINESTAR HOLDINGS GROUP. We are dedicated in providing and exporting high performance-price ratio welded & seamless steel pipes and fittings covering various steel grades. At Prime Steel Pipe, we believe that honest communication, expertise in our industry, and prompt execution lead to strong long-term relationships.
2018/06/21
In Stock ERW Pipe Price June 21 - June 28, 2018
Hot Rolling and Cold Rolling Process of Seamless Steel Pipe
Generally, there are two processes of seamless steel pipe: hot rolling process and cold rolling process.
Hot rolled seamless steel pipes will be coated with oil after a rigorous quality control by staff, then followed by several cold experiments and perforation experiments. If the perforation is too large, it needs straightening correction. After straightening correction, then transmitted by the transmitting device to the testing machine for testing experiments. If everything is all right, hot rolled seamless steel pips will be labeled and placed to the warehouse according to their specifications.
The process of cold rolled seamless steel pipes is more complicated than hot rolled seamless steel pipes. The pipe must through a three-roll rolling first and then will be sized after extrusion. If there is no cracks, cut it by cutting machine and anneal it by acidic liquid pickling. If there is a lot of bubble during pickling, it means that the seamless steel pipes can not reach required standards.
Labels:
cold rolling,
hot rolling,
seamless steel pipe
Subscribe to:
Posts (Atom)