Updated Price List For In Stock ERW Steel Pipe On FEB,24,2017
HUNAN PRIME STEEL PIPE is the export gateway of SHINESTAR HOLDINGS GROUP. We are dedicated in providing and exporting high performance-price ratio welded & seamless steel pipes and fittings covering various steel grades. At Prime Steel Pipe, we believe that honest communication, expertise in our industry, and prompt execution lead to strong long-term relationships.
Showing posts with label ERW carbon steel pipe. Show all posts
Showing posts with label ERW carbon steel pipe. Show all posts
2017/02/24
In Stock ERW Pipe Price 2017/02/24
2017/02/17
In Stock ERW Pipe Price 2017/02/16
Updated Price List For In Stock ERW Steel Pipe On FEB,16,2017
| API 5L/A53 GR.B, ERW Steel Pipe, Carbon Steel | ||||||
| Outside Diameter | Wall Thickness | Length | Quantity 数量 | Remark 标记 | EXW CHINA 出厂价 | |
| 外径 (mm) | 壁厚 (mm) | 长度 (mtr) | PCS 根数 | TON 吨位 | Surface,End | USD/TON 美金每吨 |
| 33.4 | 3.38 | 6 | 560 | 1.40 | BLACK | $547.71 |
| 42.3 | 3.56 | 6 | 210 | 0.71 | BLACK | $552.94 |
| 48.3 | 3.68 | 6 | 170 | 0.69 | BLACK | $543.79 |
| 60.3 | 3.91 | 6 | 1000 | 5.44 | BE. BLACK | $539.87 |
| 73 | 5.16 | 6 | 860 | 7.42 | BE. BLACK | $556.86 |
| 88.9 | 5.49 | 6 | 112 | 1.26 | BE. BLACK | $560.78 |
| 114.3 | 5.74 | 6 | 156 | 2.40 | BE. BLACK | $538.56 |
| 168.3 | 6.02 | 6 | 240 | 5.78 | BE. BLACK | $545.10 |
| 219 | 6.55 | 6 | 343 | 11.77 | BE. BLACK | $538.56 |
| 273 | 7.11 | 6 | 466 | 21.72 | BE. BLACK | $545.10 |
| 33.4 | 2.9 | 6 | 230 | 30.10 | BE. BLACK | $571.63 |
| 42.3 | 2.97 | 6 | 198 | 34.22 | BE. BLACK | $584.71 |
| 48.3 | 3.18 | 6 | 330 | 70.06 | BE,VANISH | $565.10 |
| 60.3 | 3.18 | 6 | 420 | 112.88 | PE BLACK | $570.33 |
| 73 | 4.78 | 6 | 378 | 182.38 | PE BLACK | $567.71 |
| 88.9 | 4.78 | 6 | 296 | 176.10 | PE BLACK | $567.71 |
| 114.3 | 4.78 | 6 | 350 | 271.10 | BE. BLACK | $567.71 |
| 168.3 | 5.16 | 6 | 280 | 348.75 | BE. BLACK | $575.56 |
| 219 | 7.04 | 6 | 160 | 353.26 | BE. BLACK | $578.17 |
| 273 | 7.8 | 6 | 150 | 459.10 | BE. BLACK | $558.56 |
| 33.4 | 2.10 | 6 | 333 | 5 | BLACK | $563.00 |
| 42.2 | 4.00 | 6 | 393 | 8 | BLACK | $566.00 |
| 48.3 | 3.25 | 6 | 412 | 10 | BLACK | $536.00 |
| 60.3 | 4.25 | 6 | 521 | 17 | BE. BLACK | $559.00 |
| 73 | 4.75 | 6 | 618 | 32 | BE. BLACK | $559.00 |
| 88.9 | 5.25 | 6 | 221 | 15 | BE. BLACK | $546.00 |
| 114.3 | 8.00 | 6 | 197 | 19 | BE. BLACK | $570.00 |
| 168.3 | 8.75 | 6 | 59 | 10 | BE. BLACK | $559.00 |
| 219 | 9.75 | 6 | 106 | 27 | BE. BLACK | $552.00 |
| 273 | 7.75 | 6 | 22 | 8 | BE. BLACK | $552.00 |
| Note: 1. The above price is based on bare pipe, for extra coating, please contact sales@primesteeltube.com; | ||||||
| 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com; | ||||||
| 3. The above price is not including any packing and end processing charge, for detailed quotation, please contact sales@primesteeltube.com; | ||||||
| 4. The above price is only valide during FEB16- FEB23; | ||||||
| 5. The applicapable MOQ for this price list is over 25 tons; | ||||||
2017/01/20
In Stock ERW Pipe Price 2017/01/21
2016/11/07
How to Weld for the ERW Steel Pipe in Winter
To ensure that the erw steel pipe in the winter welding perfect follow the following steps:
First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if necessary, preheat.
Second, not outside the groove on the base metal to start arc, arc extinction to be filled when the pit.
Third, as far as possible not in low temperature conditions for bending, correction and assembly weldments.
Fourth, preheating before welding, welding process to strictly maintain the interlayer temperature should not be lower than the preheating temperature.
Fifth, the use of low hydrogen or ultra-low hydrogen welding materials.
Six, the entire weld should be finished as far as possible to avoid interruption.
First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if necessary, preheat.
Second, not outside the groove on the base metal to start arc, arc extinction to be filled when the pit.
Third, as far as possible not in low temperature conditions for bending, correction and assembly weldments.
Fourth, preheating before welding, welding process to strictly maintain the interlayer temperature should not be lower than the preheating temperature.
Fifth, the use of low hydrogen or ultra-low hydrogen welding materials.
Six, the entire weld should be finished as far as possible to avoid interruption.
Labels:
ERW carbon steel pipe,
erw pipe,
erw steel pipe
2015/12/09
Order---ERW steel pipe shipped to Singapore
Product: ERW Steel Pipes, Carbon SteelStandard: API 5L GR.B
Specification: Outside Diameter 1''~24'', Wall Thickness: SCH40
Quantity: 10,000 meters
Surface: Black painted
Ends: Bevelled, two plastic caps with two ends
Brand: SHINESTAR
Country of Origin: China
Production Time: 25~30 days
Delivery Time: 15~25 days
Destination: Singapore
Specification: Outside Diameter 1''~24'', Wall Thickness: SCH40
Quantity: 10,000 meters
Surface: Black painted
Ends: Bevelled, two plastic caps with two ends
Brand: SHINESTAR
Country of Origin: China
Production Time: 25~30 days
Delivery Time: 15~25 days
Destination: Singapore