Differences between Water Gas Pipeline and Galvanized Steel Pipe

The biggest difference between water gas pipeline and galvanized steel pipe is that the former is seamed steel pipe and its pressure bearing capacity is low, the later is seamless steel pipe and its pressure bearing capacity is high.

Water gas pipes are constituted by welded steel pipes with thick wall, its materials are different from galvanized steel pipes. Water gas pipe is made of low-carbon steel welded pipe. those Galvanized are called galvanized iron tubes. Those non-galvanized are called black pipes.

Galvanized steel pipe is divided into cold galvanized steel pipe and hot galvanized steel pipe. The electroplating of hot galvanized steel pipe is relatively strong, its zinc layer is thick, and there is a blue ring logo on the head of galvanized pipe. Cold galvanized steel pipe is also made by electroplating, but it is made with less technology, and its performance is far worse, no blue logo. Cold galvanized steel pipe has been banned, hot galvanized steel pipe is promoted temporary use by country.

Now the water gas pipelines used in the project are basically galvanized pipe, instrument air galvanized steel pipe and galvanized steel pipe of cable laying is using hot galvanized galvanized steel pipe to produce, since the hot galvanized pipe is more corrosion-resistant. The electrical piping on the project is thin-walled tube, it can not be under pressure.

2017/04/06

Influences of Steel Strip's Geometric Dimensions on Steel Pipe's Quality

How to ensure the quality of high frequency welded pipe in the process of production? We should take the effects of roll adjustment into consideration, except that, we also need to consider the geometric dimensions of steel strip.

When the width of the steel strip is less than the allowable deviation, the squeezing force of the welded steel pipe will be reduced, which will cause the welding of the steel pipe loose, and cracks or open-end pipe will appear. When the width of the strip is greater than the allowable deviation,the squeezing force will be increased when the steel pipe is welded, which will cause tip, welding or burr welding defects appearing on the weld of the steel pipe. Therefore, the fluctuation of the strip width not only affects the accuracy of the steel pipe's outer diameter, but also seriously affects the surface quality of the steel pipe.

About the steel pipe that requires the same section wall thickness difference does not exceed the specified value (that is to say the uniformity of the steel pipe wall thickness is high), the fluctuation of strip thickness will transfer the allowable value that exceeds the thickness difference of one steel strip to the wall thickness difference of finished steel pipe, which will waste a large number of steel pipe for the thickness of the pipe exceeds the allowable deviation. Thickness fluctuations not only affect the thickness accuracy of the finished steel pipe, at the same time, the difference of steel strip's thickness will cause the extrusion pressure and welding temperature are instability while the steel pipe in the welding, which will result in welded steel pipe weld quality instability.

In addition, the existence of interlayer, impurities, trachoma and other material defects in the interior of steel is also an important factor to affect the quality of steel pipe .

Therefore, before welding the steel strip , we should check the surface quality and geometric size of each steel strip. For the steel strip that the quality does not meet the standard requirements, we shouldn't carry out production to avoid unnecessary losses.

2017/03/30

Four Techniques of Roll Adjustment When Changing Roll

We've mentioned that roll adjustment had a great influence on ensuring the quality of high frequency welded pipe in the process of production, so now we can talk about techniques of roll adjustment when changing roll.

1) Replace the steel pipe specifications, we generally replace a complete set of roll. Roll adjustment method is: use a wire to pull a centerline from the unit inlet to the outlet, and make the molding line to meet the technical requirements. After changing the roll specifications, we need to make a comprehensive adjustment for forming roller, guide roller, squeeze roller, sizing roller firstly, and then focus on the adjusting the closed hole of forming roll, guide roller, squeeze roller.

2) The role of the guide roller is to control the direction of the pipe seam and tube's bottom line height, ease the edge of the extension, control the rebound of the edge of the tube, ensure that the pipe straight without turning into the squeeze roller. Such as the guide roller adjustment is not good, it is easy to cause steel pipe seam torsion, lap welding, waving deformation around edges and other welding defects in the steel pipe welding process.

3) The squeeze roller is the key equipment of the welded pipe unit, its role is to make the pipe body which the edge of had been heated to the welding temperature to complete the pressure welding under the pressure of extrusion roller. In the production process, wo should control the size of the extrusion roll opening angle. When the extrusion pressure is too small, the weld metal strength will decrease, and it will crack when it is forced; When the extrusion pressure is too large, the welding strength will be reduced and the outer-burr amount will be increased, it will be easy to result in lap welding and other welding defects.

4) In the slow turning starting sequence of the welded pipe unit, we should pay close attention to the bearing rotation of the various parts of the roll, and adjust the roll at any time to ensure that the welding pipe welding quality and process size in line with the requirements.

2017/02/23

Intro to Hot Dip and Cold Galvanized Steel Pipe

Galvanized pipe can be classified into two kinds: cold galvanized steel pipe and hot dip galvanized steel pipe. The former has been forbidden, and the latter has been advocated temporarily in China.

Hot dip galvanized steel pipe is to make the molten metal react with iron substrate so as to produce alloy layer so that the substrate can be combine with coating combination. Hot dip galvanized steel pipe is first taken acid pickling in order to remove iron oxide on the surface of the steel tube. After acid pickling, clean up in the tank of ammonium chloride or zinc chloride or ammonium chloride and zinc chloride mixed aqueous solution, and then sent to the hot dip plating tank. Hot dip galvanized has the advantage of uniform coating, strong adhesion, long service life, etc.

Steel substrate react complex physically and chemically with molten electrolyte solution, and then form into zinc-iron alloy layer with the compact structure of corrosion resistance. Pure zinc alloy layer, alloy layer and steel substrate are integrated with each other. So, its corrosion resistant ability is extremely strong.

2. Cold Galvanized Steel Pipe

Cold galvanizing is electricity galvanizing, but the galvanized quantity is very few about only 10 g to 50 g per square meter. Its corrosion resistance ability is weaker than that of galvanized pipe. Regular galvanized steel pipe manufacturers mostly do not use electric galvanized zinc (cold galvanized) in order to guarantee the quality. Only those small enterprises with small scale and old equipment adopt electric galvanized zinc. Of course, the price is relatively cheaper. At present, the Ministry of Construction has officially indicated to weed out cold galvanized pipe which is now lagging in technology and it is not allowed to use cold galvanized pipe as water and gas pipe in the future.

The zinc layer is electrodeposited coating, and zinc layer and steel substrate layered independently. Because the thin zinc layer attached on the steel substrate is simply easy to fall off, the poor corrosion resistance is not strong. In the newly-built residence, it is prohibited to use the cold galvanized steel tube as the feed pipe.

Heat the iron and steel industry will continue in 2017?

In 2017, China's steel industry will still in a critical period of transformation and upgrading, the situation is still grim. As the welding steel pipe, seamless steel pipe, galvanized pipe, straight seam submerged arc welding pipe, carbon steel pipe manufacturer, scaffolding, and other products production services vendors, Shinestar group thinks, although in 2016 iron and steel enterprise profitability, a successful counter attack, but it is not optimistic.
Industry fundamentals, the situation of oversupply of steel market is not a fundamental change, iron and steel enterprise's profit foundation is still not strong enough. On the one hand, the high volatility in the prices of raw materials, such as coke, ore, iron and steel enterprise profit control to bring greater pressure. Since this year social inventory exploded on the other hand, the first week of Spring Festival domestic steel inventories rose to 50%, high inventory needs certain time, may be longer than expected time before industry. And monetary policy fine-tuning since this year, before the Spring Festival, the central bank raised lending facilities (MLF) interest rates after the mid, and after the central bank raised its multiple deadline reverse repurchase and stock lending facilities (SLF) interest rates, interest rates from the long side interest rates to short end, up market interest rate curve, liquidity tightening signs for a more cautious attitude to the futures market operation, greatly influenced by phase current linkage. There are some unclear steel spot market direction.
The ministry released earlier this month the first announcement to cancel the specification of 35 list of iron and steel enterprise, this is the 2012 years since its steel industry standard management, start list by "addition" change "subtraction" for the first time. Means that dissolve the iron and steel industry in 2017 will further strengthening its excess capacity.
Recently, the five ministries jointly issued by the "about further implement pressure balance policy promotes the steel market has kept running notice. "Notice" pointed out that before the recovery period of steel prices, show that the serious problem of excess steel production capacity in our country have a certain degree of improvement. Recently appeared steel prices of spot and futures markets and rapid rise in the short term, but China's steel industry oversupply problem has not been fundamentally solved. Also notice again, to crack down on illegal production and sales "groud of steel" behavior, before the end of June 2017 in accordance with the law to ban the production of construction steel power frequency furnace, intermediate frequency furnace capacity, manifests the country determined to clean up behind the capacity determination.
Clean up 2017 "groud of steel" as an important content to work capacity. Provinces such as guangdong, jiangsu, hebei, sichuan also have issued relevant documents, determined to crack down on illegal production "groud of steel" production and sales. Iron and steel industry in China has developed from incremental into the stage of development, reducing the overall production capacity surplus part of the advanced capacity are resolve, "groud of steel" must clean up all.
As a based in China, service global steel production enterprises, Shinestar group will work hard to realize the transformation and upgrading, combined with their own situation to make strategic plan, produce the high quality of welded steel pipe, seamless steel pipe, galvanized pipe, straight seam submerged arc welding pipe, carbon steel pipe, scaffolding, and other products, promote the competitiveness of the enterprise.

2017/02/08

Chinese economy with stand "look back"

People usually like to set a goal at start of the year,than look back to which goal was reached or which was not.In the past 2016,how about China’s expected goals?Can they stand the test of “look back”?Shinestar Steel Research Institute thinks the answer is yes according to the latest data.
In general,macroeconomic policy should focus on four goals at the same time:economic growth,full employment,price stability and international balance of payments.Accordingly,the government work report in 2016 said the main target in this year is:gross domestic product growth of 6.5% - 7%,consumer prices rose 3%,more than 10 million new jobs in cities and towns,basic balance of international payments.
According to economic growth, gross domestic product in 2016 GDP growth of 6.7% year-on-year, not only in line with expectations, and across the two mark: at one is success across 70 trillion yuan, 74.4 trillion yuan;The other one is after 2014 to us $2014, past the $11 trillion mark again this time.In addition, according to the international monetary fund estimates that India's economic growth rate in 2016 was 6.6%, lower than China.But a year ago, China's GDP growth by 6.9%, India is as high as 7.6%.This means that China's economic growth has been the first to return to the world's major economies.This "first", it is under the big idea of structure adjustment, quality priority, made the task well.
In employment ways,the new jobs in cities and towns of up to 12.49 million people in the first 11 months of 2016, the year 13 million new basic no suspense.The goal of building a town more than 10 million new jobs were not only finished ahead of schedule, and overfulfilled.In prices, consumer prices rose 2% in all the year round, full compliance with the start of "or 3% or so" target;As for the balance of payments, national safe has given the conclusion that overall improvement in cross-border capital flows, flow pressure eased, outside the main investment in China has been a net outflow from into a net.
In addition to the four major goals to finish well, the Chinese economy transcripts of many "bright eye".For example, the "three to one drop one fill results" preliminary revealed, accelerate industrial structure optimization of transformation, the new kinetic energy is more rapid growth, strategic emerging industrial added value growth of a large piece of higher than GDP growth.Shinestar group as submerged arc weld spiral welded pipe, seamless steel pipe, stainless steel tube, scaffolding, galvanized pipe and other products production services vendors, has always been positive response national policy, the future will also be going all out, to transformation and upgrading, promote the competitiveness of the enterprise.
Chinese meet difficult toil under pressure for a year, has brought the Chinese economy withstand "look back" report card.Step by step, has not come easily.Thankfully, this accomplishment this transcript is worth us to have a good collection.Shinestar group will continue to produce more and better the submerged arc weld spiral welded pipe, seamless steel pipe, ERW Steel Pipe, scaffolding, galvanized pipe and other products, for China's economic take-off added "new wing".

2017/01/17

China's foreign trade inventory in 2016

Look back over past 2016,though China’s foreign trade growth fell,structure optimization,benefits of quality and so on showed many new changes and bright spot.As a Welding steel pipe, line pipe, straight seam submerged arc welding pipe, galvanized pipe, submerged arc weld spiral welded pipe, scaffolding and other products of steel production services provider,Shinestar group has been paying close attention to the development of foreign trade.Shinestar Steel Research Institute said the development way of China's foreign trade on the import and export trade structure, market distribution and trade subject has different degree of optimization and improvement in 2016 that mainly embodied in these aspects:
First,internal production of power to further strengthen,private enterprises import and export growth of 2.2% in 2016,accounting for 38.1% of China's total foreign trade, up 1.2 percentage points from 2015.Our trade way tend to be more reasonable,the general trade import and export growth of 0.9%,accounting for 55% of the total cost of the foreign trade of our country,up 1 percentage points from 2015.Gradient transfer of processing trade progressed steadily,the import and export of processing trade in the central and western regions increased by 3.2%,accounting for the proportion of total cost of the foreign trade in our country ,up 1.3 percentage points from 2015.The international market diversification has made some progress,some "along the way" along the country's rapid trade growth,to India, Russia, Pakistan, Poland and Bangladesh and other countries import and export growth of 4.1%, 8.7%, 7.2%, 4.1% and 9.2%.
Second,in the superior products in optimal out has made good progress.In terms of exports,China’s traditional advantage products exports growth remained,textiles, plastic products and toys export growth of 1.9%, respectively, 0.5% and 24.9%,still keep a good competitive advantage.At the same time benefit from China's abundant capital, perfect industrial system and strong manufacturing capacity, our country enterprise in the speed up to go out and promote the international cooperation capacity also led equipment manufacturing and export of high value-added products,China's enterprises in accelerating to go out and promote international capacity cooperation also led the equipment manufacturing and high value-added products exports.Some mechanical and electrical products and equipment manufacturing exports also maintained a good momentum, such as medical equipment export growth of 6.1%, auto parts export growth of 3.5%.
Third,in terms of import,China's crude oil, copper and other commodities imports in 2016 continue to maintain the growth momentum, which also shows that China's domestic economy is running smoothly, demand has picked up.At the same time, the policy effect of expanding imports and optimizing import structure shows that some high-tech products such as advanced technology, key parts and important equipment have a rapid growth in import.In 2016, imports of electrical products increased by 1.9%, of which turbojet engine imports increased by 26.8%, ship growth of 26.6%, measurement and analysis of automatic control equipment and apparatus increased by 10.7%.
The future, we need to be more active in the face of complex and volatile international and domestic economic situation and import and export environment, and strive to build an open economy new system, and continuously improve the quality and efficiency of foreign trade development, build a higher level of open economy, the full realization of the "big Into the big out "to" excellent into excellent "change. Shinestar Group will also adhere to independent innovation, pay more attention to cultivate technology, brand, quality, service as the core of the new advantages of foreign trade competition, to produce more high-quality welded steel pipe, pipe, straight seam submerged arc welded pipe, galvanized steel pipe, ERW steel pipe, scaffolding and other products, playing an international competitiveness of the steel group.

2016/11/28

Corrosion Problems of ERW Steel Pipe

ERW steel pipe outer coating of the basic functions,there are two aspects:
First,make the ERW steel pipe surface from electrochemical corrosion,bacterial corrosion protection of soil basic physical media.
Second,resist the soil medium move creep stress,basic mechanical protection method static sterss and abrasion strength and structure and so on.

The basic principles of the outer coating selected city gas pipeline:
a,good insulation properties and mechaniacal properties;
b,good resistance to cathodic disbanding performance;
c,good resistance to water,gas permeability;
d,good chemical resistance properties of soaking and aging;
e,low tempercature and high temperature performance;
f,easy mending and mending;
g,the price is reasonable.

2016/11/10

Petro China and Malaysia has sighed Sabah Natural Gas Pipeline Project

On the afternoon of November 1, 2016, under the witness of Premier Li Keqiang and Malaysian Prime Mnister Najib Razak, The deputy general manageer of China National Petroleum Corporation (CNPC) Liu Hongbin and the Chairman of Strategic Energy Co., Ltd of Sulia Mohammad Evan Seriga Abu, on behalf of the two companies, have dual signed the Contract for the Construction and Trail Operation of Sabah Gas Pipeline Project and the Contract for Construction and Commissioning of Multu-medium Pipeline Project in Beijing.

Sabah gas pipeline and multi-media pipeline is the Malaysian federal government-led projects. Under the agreement, China Petroleum Pipeline Bureau will EPCC way to undertake the construction of these two pipeline projects.

In Stock ERW Steel Pipe Price 2016/11/11

API 5L/A53   GR.B, ERW Steel Pipe, Carbon Steel
Outside DiameterWall ThicknessLengthQuantity 数量Remark 标记EXW CHINA 出厂价 
外径 (mm)壁厚 (mm)长度 (mtr)PCS 根数TON 吨位Surface,EndUSD/TON 美金每吨
168.3 7.5 5.85014.24 BE. BARE$515.82
355.6 6.8 6.57510.86 BE. BARE$546.80
508.0 13.0 1262.94 BE. BARE$560.27
114.3 9.5 63014.30 BE. BARE$583.16
273.0 8.5 11.83054.91 BE. BARE$518.52
139.7 4.9 6.5232.55 BE. BLACK$507.74
219.1 10.5 65622.20 BE. BLACK$531.99
273.0 9.3 122317.04 BE. BLACK$523.91
355.6 12.7 63013.10 BE. BLACK$565.66
406.4 6.4 127040.75 BE. BLACK$552.19
33.43.561322.04 BLACK$504.62
48.34.256561.55 BLACK$516.92
735.5 6422.31 BLACK$523.76
76.15.5 61106.32 BE. BLACK$521.03
1086.5 6595.76 BLACK$552.48
1275.6 6737.34 BE. BLACK$501.48
1337.7 614220.27 BLACK$493.68
1524.3 623021.61 BE. BLACK$497.48
1656.0 611416.09 BE. BLACK$505.98
168.33.5 616514.08 BLACK$490.94
26.72.876.11982.04 BLACK$507.94
42.23.5663457.02 BLACK$498.58
48.33.7 5.81293.03 BLACK$489.22
33.43.9 5.84327.12 BE. BLACK$489.22
733.4 5.836812.39 BE. BLACK$498.58
1596.0 6.112316.99 BE. BLACK$481.20
2739.3 6.1301110.70 BE. BLACK$514.62
1336.5 5.822025.87 BE. BLACK$485.21
1788.0 5.820640.07 BE. BLACK$491.90
168.37.1 618831.88 BE. BLACK$490.56
   Note:  1. The above price is based on bare pipe, for extra coating, please contact sales@primesteeltube.com;
             2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com;
             3. The above price is not including any packing and end processing charge, for detailed quotation, please contact sales@primesteeltube.com;
             4. The above price is only valide during NOV 11-  18;
             5. The applicapable MOQ for this price list is over 25 tons;

In Stock ERW Steel Pipe Price 2016/11/11

API 5L/A53   GR.B, ERW Steel Pipe, Carbon Steel
Outside DiameterWall ThicknessLengthQuantity 数量Remark 标记EXW CHINA 出厂价 
外径 (mm)壁厚 (mm)长度 (mtr)PCS 根数TON 吨位Surface,EndUSD/TON 美金每吨
168.3 7.5 5.85014.24 BE. BARE$515.82
355.6 6.8 6.57510.86 BE. BARE$546.80
508.0 13.0 1262.94 BE. BARE$560.27
114.3 9.5 63014.30 BE. BARE$583.16
273.0 8.5 11.83054.91 BE. BARE$518.52
139.7 4.9 6.5232.55 BE. BLACK$507.74
219.1 10.5 65622.20 BE. BLACK$531.99
273.0 9.3 122317.04 BE. BLACK$523.91
355.6 12.7 63013.10 BE. BLACK$565.66
406.4 6.4 127040.75 BE. BLACK$552.19
33.43.561322.04 BLACK$504.62
48.34.256561.55 BLACK$516.92
735.5 6422.31 BLACK$523.76
76.15.5 61106.32 BE. BLACK$521.03
1086.5 6595.76 BLACK$552.48
1275.6 6737.34 BE. BLACK$501.48
1337.7 614220.27 BLACK$493.68
1524.3 623021.61 BE. BLACK$497.48
1656.0 611416.09 BE. BLACK$505.98
168.33.5 616514.08 BLACK$490.94
26.72.876.11982.04 BLACK$507.94
42.23.5663457.02 BLACK$498.58
48.33.7 5.81293.03 BLACK$489.22
33.43.9 5.84327.12 BE. BLACK$489.22
733.4 5.836812.39 BE. BLACK$498.58
1596.0 6.112316.99 BE. BLACK$481.20
2739.3 6.1301110.70 BE. BLACK$514.62
1336.5 5.822025.87 BE. BLACK$485.21
1788.0 5.820640.07 BE. BLACK$491.90
168.37.1 618831.88 BE. BLACK$490.56
   Note:  1. The above price is based on bare pipe, for extra coating, please contact sales@primesteeltube.com;
             2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com;
             3. The above price is not including any packing and end processing charge, for detailed quotation, please contact sales@primesteeltube.com;
             4. The above price is only valide during NOV 11-  18;
             5. The applicapable MOQ for this price list is over 25 tons;